MCS CertifiedTrustMark ApprovedRECC AccreditedNICEIC Approved
🏔 RURAL PACKAGE

Battery Retrofit Scottish Borders

Battery storage retrofit in Scottish Borders (115,510 residents) costs £3,500–£7,500 installed with 0% VAT applied automatically until 31 March 2027. 52% of Scottish Borders properties are not connected to mains gas, meaning most qualify for the £18,000 HES rural package (£9,000 grant + £9,000 interest-free loan). The DNO for Scottish Borders is SPEN. PVGIS irradiance: 940 kWh/kWp/yr. Scottish Energy Efficiency serves all Scottish Borders postcodes. MCS certified, TrustMark approved. Free survey: 0141 230 0198.
£18,000
Rural Package
SPEN
DNO Operator
940
kWh/kWp/yr PVGIS
~52%
Off-Gas Grid

Local Case Study

A 4-bed farmhouse in Scottish, Scottish Borders retrofitted a Duracell Dura5 10kWh battery onto their 4kW solar system (installed 2016, FiT-era).

Cost:£5,800
Annual saving:£1350/year
FiT payments:Unaffected

Planning & Permissions

Rural locations may require landscape assessment. National Park areas need consultation.

ℹ️ We handle all DNO (SPEN) paperwork and MCS certification

Get Your Free Survey in Scottish Borders

💬